Banner: John F. Kennedy Space Center, Safety and Mission Assurance Directorate.  NASA Logo at left used for navigation.
KSC Home.  Used for navigation. Multimedia.  Used for navigation. Site Search.  Used for navigation. KSC Information Center.  Used for navigation. NASA Centers.  Used for navigation.
NASA Home.  Used for navigation.
KSC SMA
NASA Chief Safety and Mission Assurance Officer.  Used for navigation.
NASA Office of Safety and Mission Assurance (OSMA).  Used for navigation
NASA Aerospace Safety and Advisory Panel (ASAP).  Used for navigation.
NASA Engineering and Safety Center.  Used for navigation.
Vision for Space Exploration.  Used for navigation.
Other NASA KSC Organizations.  Used for navigation.
KSC Information Center.  Used for navigation.
NASA News and Events.  Used for navigation.
KSC News and Events.  Used for navigation.
Reliability SMA Home

 

 

Establishing and Evaluating Various and Interrelated
"Probability of Success" (Reliability) Requirements

         Description                                                                            File/Link

         Page 1: Narrative                                                                          Narrative

         Page 2: Fault Tree—used as a method to logicaly                             Fault Tree
                     relate the requirements.

         Page 3: Tool - used to simulate and determine the                                Tool
                     overall result (top goal) based on various
                     levels of probability of success (reliability)
                     of the requirements. Click the "Summary"
                     tab for base scenario and 17 other simulations. 

 
 
 
FirstGov Logo.  Used for navigation. NASA Home.  Used for navigation. FirstGov Logo.  Used for navigation. NASA Home.  Used for navigation. NASA Home.  Used for navigation.
Link
Contact via E-Mail
NASA Logo.  Used for navigation.